现有网络计划技术的研究主要针对单层网络,难以有效地指导大型项目的生产。原因在于大型工程项目生产过程复杂,工序成千上万,给对应的网络图描述带来了极大的困难。然而,通过网络分层技术则能把一个复杂的网络分解成多个简单的子网络,即将大型网络过渡到几个简单的单层网络,继而利用单层网络技术对其进行分析。本文依据大型网络的构建过程提出简化组合模型,将多层次复杂网络转化为多个单层次简单网络,在此基础上给出分层网络机动时间的计算公式。最后通过一个实例验证了此方法的正确性和可行性。
The current network planning technique is mainly concern with single-layer network, which lacks the efficiency in guiding the production of large-scale manufacturing project. The production process of large-scale project whose activities are tens of thousands is complex, which brings extremely difficulty in describing the corresponding network. However, according to the hierarchical network technology, a com- plex network can be divided into several simple sub-networks, which means a large type of network can be transformed to a single-layer network, and single-layer network technology can be used to analyze the com- plex network. In this paper, based on the process of building a large type of network, the issue that how to simplify the network of large-scale project is studied in this paper, several single-layer networks is divid- ed, and the calculation of the float in hierarchical network is carried out. Finally, correctness and feasibili- ty of the conclusion are illuminated through example analysis.
出处
《中国管理科学》
CSSCI
北大核心
2015年第6期147-152,共6页
Chinese Journal of Management Science
基金
国家自然科学基金资助项目(71171079)
北京市产学研联合培养研究生共建项目资助
关键词
大型项目网络
分层网络
机动时间
large-scale projects
hierarchy network
float time