特高拱坝施工及初次蓄水期变形回归模型研究 被引量:6

Research on deformation regression model for super-high arch dam during its construction and initial impoundment
下载PDF
导出
摘要 针对特高拱坝施工及初次蓄水期间的变形特点,在传统模型基础上,增加了初次蓄水坝高因子、初蓄温度因子和初蓄渗流因子,建立了施工及初次蓄水作用下的大坝变形回归模型。通过对某高拱坝初次蓄水期间大坝回归分析可知,新模型拟合精度高,各测点相关系数均在0.99以上。水压分量、温度分量、坝高分量、初蓄及时效分量变化趋势以及在整个径向位移中所占比例符合实际规律,考虑了施工及初次蓄水期间坝体上升、外界温度影响、坝体自身温度变化、初次蓄水及渗流作用、时效等影响,反映了初蓄期间坝体的变形特性。总之,新的大坝变形回归模型能够较好地反映施工及初次蓄水期的各种影响因素,便于分析施工及初次蓄水期坝体的工作性态。 Aiming at the deformation characteristics of super-high arch dam during its construction and initial impoundment, a deformation regression model for the dam under the effects of the construction and its initial impoundment is established herein on the basis of the conventional model, in which the factors of dam height, temperature and seepage during the initial impoundment are added. It is known through the dam regression analysis made during the initial impoundment of a high arch dam that this new model has a high fitting accuracy with the correlation coefficients of all the measuring points being above 0. 99. Under the consid- eration of the construction and the effects of the rise of dam body, the surrounding temperature and the self-temperature change of dam body as well as the effects of the initial impoundment, seepage, time effect, etc. , the changing trends of the components of water pressure, temperature, dam height, initial impoundment and time effect and their proportions in the entire radial dis- placement accord with the actual law, which reflect the deformation characteristics of the dam body during the initial impound- ment. Generally, this new dam deformation regression model can satisfactorily reflect all the impacting factors during the con- struction and the initial impoundment, and then is convenient to analyze the operation behavior of the dam during the construction and initial impoundment.
出处 《水利水电技术》 CSCD 北大核心 2015年第1期70-75,共6页 Water Resources and Hydropower Engineering
基金 国家自然科学基金资助项目(51209235) 中国水科院科研专项(1412)
关键词 特高拱坝 坝体变形 施工及初次蓄水期 位移回归模型 super-high arch dam construction and initial impoundment displacement regression model
  • 相关文献

参考文献10

  • 1张进平,黎利兵,卢正超.大坝安全监测研究的回顾与展望[J].中国水利水电科学研究院学报,2008,6(4):317-322. 被引量:28
  • 2Toini D. Observed Behavior of Several Italian Arch Dams[ J]. Proc,ASCE Journal of the Power division, 1956, 82(12). 被引量:1
  • 3吴中如主编..重大水工混凝土结构病害检测与健康诊断[M].北京:高等教育出版社,2005:384.
  • 4吴中如等著..水工建筑物安全监控理论及其应用[M].南京:河海大学出版社,1990:374.
  • 5顾冲时,吴中如著..大坝与坝基安全监控理论和方法及其应用[M].南京:河海大学出版社,2006:293.
  • 6李珍照主编..大坝安全监测[M].北京:中国电力出版社,1997:120.
  • 7张进平,庄万康.大坝安全监测的位移分布数学模型[J].水利学报,1991,23(5):28-35. 被引量:34
  • 8赵春,张进平,等.包含首蓄因子的心墙土石坝水平位移统计模型研究[C]//中国水利学会第三届青年科技论坛论文集.郑州:黄河水利出版社,2007. 被引量:1
  • 9赵春.大坝位移监控预报模型和病险水库除险加固重要性排序[D].北京:中国水利水电科学研究院,2010. 被引量:1
  • 10混凝土坝安全监测技术规范[S].中华人民共和国国家经济贸易委员会,2003. 被引量:2