母杜柴登矿首采工作面疏干水量计算研究 被引量:10

Calculation of Drainage Water Yield in First Mining Face of Muduchaideng Mine
下载PDF
导出
摘要 分析了母杜柴登首采工作面主要充水水源为顶板砂岩含水层,通过放水试验获取含水层的渗透系数,在此基础上,采用干扰井群的叠加原理计算了首采工作面内部的疏干水量,并根据计算确定了顶板疏放水钻场的最终布置方式,为计算工作面内部疏干水量提供了一种新的思路。 According to analysis, water filling source of the first mining face roof in Muduchaideng Coal Mine was sandstone aquifer. The permeability coefficient was obtained through underground dewatering test. On this basis, the drainage water yield in the first mining face was calculated based on the superposition principle of the interfering well group, according to which, the final arrangement of the roof water drainage drilling field was determined. The study provided a new way of interior drainage water yield calculation.
作者 刘基 高敏
出处 《煤炭工程》 北大核心 2015年第6期70-72,共3页 Coal Engineering
基金 国家自然科学基金资助项目(41302214) 中煤科工集团西安研究院创新基金(2013XAYCX010)
关键词 工作面疏水 放水试验 渗透系数 疏干水量 顶板疏放水 working face dewatering dewatering test permeability coefficient drainage water yield roof dewatering
  • 相关文献

参考文献7

二级参考文献16

共引文献215

同被引文献93

引证文献10

二级引证文献85

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部