摘要
通过对神华宁夏煤业集团石槽村煤矿煤层赋存情况、开拓现状、21采区情况的介绍,在分析采区建设条件后提出了可行的采区建设方案,在进行详细技术经济比较后,选取了石槽村煤矿21采区最优建设方案。本文较好的体现了完成生产煤矿采区接续设计的分析重点,可为矿井建设和采区准备方案选择提供参考。
Through the introduction to the situation of coal seam, exploitation situation and situation of 21 mining area of Shicao Village Coal Mine, Shenhua Ningxia Coal Industry Group, we put forward feasible development scheme for mining area after analyzing the construction condition of mining area, and pick out superior constructive scheme for 21 mining area of Shicao Village Coal Mine after the detailed comparison of technical and economic. This paper reflects the key analysis point of sequential design for completing production in coal mining area, and it provides reference for mine construction and preparation scheme select for mining area.
出处
《神华科技》
2015年第3期32-36,共5页
Shenhua Science and Technology
关键词
煤矿
采区
准备方案
Coal mine
Mining area
Preparation scheme