期刊文献+

浅谈电力隧道穿越桥区安全性评估与控制

Elementary Discussion on Safety Estimation and Control of Electric Power Tunnel Crossing Bridge Area
下载PDF
导出
摘要 以北京市丰台区110 k V电力隧道工程穿越榴乡桥区的施工安全技术管理工作为背景,对隧道穿越桥区安全性评估工作进行总结和探索,从施工角度对电力隧道设计施工提出优化建议,为今后的隧道穿越既有地表结构物安全性评估工作提供参考。 Taking the construction safety technical management of Beijing Fengtai District 110 k V Electric Power Tunnel Project crossing the area of Liuxiang Bridge as the background, the paper summarizes and studies the safety assessments of tunnel crossing the area of bridge, and puts forward the optimized proposal for the design and construction of electric power tunnel from the construction angle, which can be referred for the safety assessments of tunnel crossing the existing ground structures in the future.
作者 赵晓延
出处 《城市道桥与防洪》 2015年第5期177-179,185,共4页 Urban Roads Bridges & Flood Control
关键词 隧道 穿越 挡墙 桥梁 评估 tunnel,crossing,retaining wall,bridge,assessment
  • 相关文献

参考文献4

  • 1陈兵,潘可明.地铁近接施工时通道桥的变形计算及分析[J].市政技术,2012,30(6):108-110. 被引量:2
  • 2苏洁..浅埋暗挖法隧道施工对邻近桩基的影响及其控制[D].北京交通大学,2009:
  • 3何杰.地铁施工影响区域桥梁结构评估及沉降指标确定[D].北京:北京科技大学,2005. 被引量:1
  • 4姚海波..大断面隧道浅埋暗挖法下穿既有地铁构筑物施工技术研究[D].北京交通大学,2005:

二级参考文献3

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部