期刊文献+

某地浸铀矿床资源储量三维动态管理方法研究 被引量:7

Study on the method of three dimensional reserves by dynamic management at one in-situ leaching deposit
下载PDF
导出
摘要 以新疆某地浸开采矿床块段X为例,应用DIMINE数字矿山软件模拟三维状态下矿床勘探和开拓过程中钻孔数据不断增加、矿体形态发生变化的过程,并采用距离幂次反比法对不同阶段的块段模型进行估值和资源储量估算;通过矿体形态和资源储量的对比分析,提出了资源储量勘查增减、重算增减和开采量等资源储量动态管理中关键项的计算方法;探讨了应用三维数字矿山软件进行资源储量动态管理的方法和应用前景。 Taking block X of one in-situ leaching deposit in Xinjiang as an example, the process of the borehole data increasing and the ore body shape changing during the exploration and exploiting process is simulated under the condition of three-dimension by using a digital mine software DIMINE. The re- serves of ore body model of various stages are estimated by distance power inverse ratio method. Then through comparison and analysis of ore body shapes and reserves, computing method of key items of resources dynamic management including alteration caused by prospecting, recalculation and exploita- tion in different stages are put forward. And the methods and application prospects of 3D digital mine software to reserves dynamic management of in-situ leaching deposit are discussed.
出处 《铀矿冶》 CAS 2015年第2期97-102,共6页 Uranium Mining and Metallurgy
关键词 地浸铀矿山 数字矿山软件 资源储量动态管理 in-situ leaching deposit, digital mining software, dynamic management of reserves
  • 相关文献

参考文献5

二级参考文献27

共引文献54

同被引文献83

引证文献7

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部