摘要
根据飞来峡水利枢纽工程建成后的实际工程参数及确定的调度运行规则 ,对飞来峡水电站的发电效益重新进行了评估分析 ,为工程的科学调度运行提供了依据。
According to the practical parameters and the defined operational rules of Feilaixia hydro-junction project,the dynamoelectric benefits of Feilaixia hydroplant is evaluated and analysed.That gives evidences for the scientific operation of the project.
出处
《中山大学学报论丛》
2000年第4期282-285,共4页
Supplement to the Journal of Sun Yatsen University