期刊文献+

分岔隧道喇叭口段现场监测数据分析与数值模拟研究 被引量:1

Site Monitoring Data Analysis and Numerical Simulation Study on Horn Mouth Section of a Bifurcate Tunnel
下载PDF
导出
摘要 介绍了某分岔隧道喇叭口段的现场监测方法,并结合具体施工过程,对现场监测结果进行了分析;通过数值模拟手段分析了隧道各开挖阶段对地表沉降及围岩不同位置的应力和位移的影响。研究结果表明:随着深度增加,围岩逐渐趋于稳定;上覆围岩越薄,地表沉降越大。研究结果可为同类隧道设计、施工提供必要的依据。 The deformation monitoring system of bifurcation tunnel is described in this paper,and combined with construction process,the monitoring result is analyzed. Based on the result of the investigation on dynamic construction numerical value,the influences of the tunnel excavates on the earth's surface settlement and the surrounding rocks' strain and displacement at different positions are analyzed.It's shown that with the increase in depth,rock stratum tends to be steady gradually,as well as the thinner the upper cover of surrounding rock,the greater the earth's surface settlement. This study can provide indispensable evidence for design and construction of bifurcation tunnel.
出处 《公路工程》 北大核心 2015年第2期314-317,共4页 Highway Engineering
关键词 分岔隧道 喇叭口段 现场监测 数值模拟 bifurcation tunnel horn mouth section site monitoring numerical simulation
  • 相关文献

参考文献11

二级参考文献73

共引文献159

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部