随着我国核电事业的不断发展,在非硬质岩石地基上建设核电项目将势必进行。本文结合粤西一个 AP-1000机型的非硬质岩地基核电厂,分别按AP-1000标准文件要求、工程案例类比等方法,对核电厂非硬质岩地基的适宜性作出了合理的评价。
Along with the development of nuclear power ind-ustry in China, so nuclear power projects on the foundation of on-hard rock are bound to be constructed. Combining a AP-1 model 000 non-nuclear power plants on hard rock foundation in Western Guangdong, according respectively to the methods of requirements of AP-1000 standard documents and case ana-logy, made a reasonable assessment of the suitability of the fo-undation of non-hard rock applied to the nuclear power plant.
出处
《城市建筑》
2014年第24期178-178,181,共2页
Urbanism and Architecture
关键词
核电厂
非硬质岩
地基适宜性
nuclear power plant
non-hard rock
suitability of foundation