本文以承秦高速三标为背景,通过优化施工便道、临时电力、弃土场、拌和站、梁场等大临工程施工方案,优化隧道、桥梁设计方案,有效降低了施工成本,取得了较好的经济效益,对山区高速公路施工成本管理有一定的借鉴意义。
Taking the Chengqin Expressway NO.3 section as background, this paper effectively reduced the construction cost by optimizing the construction program of large temporary engineering, such as construction access roads, temporary power, spoil ground, mixing station, beam field and so on, and optimizing the tunnel and bridge design, and achieved a better economic efficiency, which had a certain significance for the cost management of expressway construction in the mountain area.
出处
《价值工程》
2015年第16期124-126,共3页
Value Engineering
关键词
优化
大临工程
设计方案
效益
optimization, large temporary engineering~ design~ benefit