摘要 Periodical inspections and an age-based preventive replacement( APR) model were proposed based on a two-stage failure process for a single component system. Inspection activities were performed at regular intervals. Once the system was identified to be at defective state by inspection,a maintenance decision needed to be made that whether to replace the defective system immediately or wait till the preset APR time. So a threshold was introduced into the model and called as inspection-based preventive replacement( IPR) threshold. If the distance from the defect identification point to the APR time was longer than the threshold, a preventive replacement( PR) action was made; otherwise PR action was to wait till the APR time. Two models were proposed and compared,and a numerical example was conducted to illustrate the applicability of the model. Periodical inspections and an age-based preventive replacement( APR) model were proposed based on a two-stage failure process for a single component system. Inspection activities were performed at regular intervals. Once the system was identified to be at defective state by inspection,a maintenance decision needed to be made that whether to replace the defective system immediately or wait till the preset APR time. So a threshold was introduced into the model and called as inspection-based preventive replacement( IPR) threshold. If the distance from the defect identification point to the APR time was longer than the threshold, a preventive replacement( PR) action was made; otherwise PR action was to wait till the APR time. Two models were proposed and compared,and a numerical example was conducted to illustrate the applicability of the model.
出处 《Journal of Donghua University(English Edition)》 EI CAS 2014年第6期744-746,752,共4页 东华大学学报(英文版)
基金 National Natural Science Foundation of China(NSFC)(No.71231001) China Postdoctoral Science Foundation Funded Project(No.2013M530531) the Fundamental Research Funds for the Central Universities of China(Nos.FRF-M P-13-009A,FRF-TP-13-026A) the MOE PhD Supervisor Fund,China(No.20120006110025)
关键词 delay-time INSPECTION age-based preventive replacement(APR) inspection-based preventive replacement(IPR) preventive maintenance(PM) delay-time inspection age-based preventive replacement(APR) inspection-based preventive replacement(IPR) preventive maintenance(PM)
  • 相关文献

参考文献15

  • 1Wang W. An Inspection Model for a Process with Two Types of Inspections and Repairs [ J ]. Reliability Engineering and System Safety, 2009, 94(2): 526-533. 被引量:1
  • 2Golmakani H R, Moakedi H. Periodic Inspection Optimization Model for a Multi-component Repairable System with Failure Interaction [ J ]. The International Journal of Advanced Manufacturing Technology, 2012, 61( 1/2/3/4): 295-302. 被引量:1
  • 3Cui L R, Xie M, Loh H T. Inspection Schemes for General Systems [J]. IIE Transactions, 2004, 36(9) : 817-825. 被引量:1
  • 4Taghipour S, Banjevic D, Jardine A K S. Periodic Iinspection Optimization Model for a Complex Repairable System [ J ]. Reliability Engineering and System Safety, 2010, 95 ( 9 ) : 944-952. 被引量:1
  • 5Huynh K T, Berenguer C, Berenguer C, et al. A Periodic Inspection and Replacment Policy for Systems Subject to Competing Failure Modes due to Degradation and Traumatic Events[ J]. Reliability Engineering &System Safety, 2011, 96 (4) : 497-508. 被引量:1
  • 6Christer A H, Waller W M. Reducing Production Downtime Using Delay-Time Analysis [ J ]. Journal of the Operational Research Society, 1984, 35(6) : 499-512. 被引量:1
  • 7Wang W. An Inspection Model Based on a Three-Stage Failure Process [ J]. Reliability Engineering and System Safety, 2011,96 (7) : 838-848. 被引量:1
  • 8Scarf P A, Cavalcante C, Dwight R A, et al. An Age-Based Inspection and Replacement Policy for Heterogeneous Components [J]. IEEE Transactions on Reliability, 2009, 58(4) : 641-648. 被引量:1
  • 9Castro I T, Barros A, Grail A. Age-Based Preventive Maintenance for Passive Components Submitted to Stress Corrosion Cracking [ J]. Mathematical and Computer Modelling, 2011, 54(1 ) : 598-609. 被引量:1
  • 10EI-Ferik S. Economic Production Lot-Sizing for an Unrefiable Machine under Imperfect Age-Based Maintenance Policy [ J ]. European Journal of Operational Research, 2008, 186 ( 1 ) : 150-163. 被引量:1

同被引文献7

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部