基于PSCAD的500kV武—察同塔双回输变电工程内过电压仿真分析 被引量:8

Internal Overvoltage Simulation for 500 kV Wu-Cha Double-circuit Transmission Line on Same Tower in Power Transmission and Transformation Project Based on PSCAD
下载PDF
导出
摘要 为满足500 k V武—察输变电工程系统调试需要,文中利用PSCAD电磁暂态仿真软件,在系统调试方式、正常运行方式及检修方式下对500 k V武—察输变电工程系统启动过程中工频过电压、控制电压、潜供电流与恢复电压进行计算分析,以便为工程实施提供理论依据,为运行提供参考。 To meet the needs of the 500 k V system debugging Wu-Cha power transmission and transformation project, in this paper, using the electromagnetic transient simulation software PSCAD,calculates and analyzes the power frequency overvoltage, the control voltage, secondary arc current and recovery voltage during the system startup process in 500 k V Wu-Cha power transmission and transformation project, under three modes: the system debugging mode, normal operation mode and maintenance mode, provides theoretical basis for engineering implementation and reference for operation.
出处 《高压电器》 CAS CSCD 北大核心 2015年第4期84-92,共9页 High Voltage Apparatus
关键词 工频过电压 500 k V输变电工程调试 控制电压 潜供电流与恢复电压 PSCAD仿真 power frequency overvoltages 500 k V power transmission and transformation project debug the control voltage secondary arc current and recovery voltage PSCAD simulation
  • 相关文献

参考文献25

二级参考文献109

共引文献147

同被引文献84

引证文献8

二级引证文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部