期刊文献+

不良地质洞段输水隧洞塌方处理及后续施工方案 被引量:4

Processing and Follow-up Treatment Scheme of Water Delivery Tunnel Roof-falling for Adverse Geology
下载PDF
导出
摘要 山西省东山供水工程某输水隧洞位于黄土丘陵地区,为沟谷冲积区,土体中砂、砂砾石、淤泥填充现象显著,并且存在渗水、涌水问题,在施工过程中掌子面发生连续塌方导致隧洞冒顶。根据地质情况与施工条件对塌方洞段处理方案进行对比研究,最终提出了技术可行、经济合理的处理方案,对穿越类似不良地质的隧洞施工具有参考意义。 The water supply engineering of Dongshan in Shanxi Province is located at loess hilly landform, the formation is alluvial district. The soil is composed by sand, gravel and silt, so this location has the problem of seepage and gushing. This will cause the roof-falling of tunnel face in construction of tunnel. According to the geological conditions and construction condition, the treatment scheme is compared. At last the treatment scheme of technical feasibility and economic rationality is proposed. Results of this paper provided reference significance for the tunnel passing through the adverse geology.
作者 邓跃东
出处 《山西水利科技》 2015年第1期40-42,共3页 Shanxi Hydrotechnics
关键词 输水隧洞 不良地质 涌水 塌方冒顶 处理方案 water delivery tunnel adverse geology gushing roof-falling the treatment scheme
  • 相关文献

参考文献3

  • 1郑陈曼.隧道塌方预警预测体系及治理措施研究[D].上海:同济大学,2008. 被引量:2
  • 2车广才,杜以昌.浅埋隧道塌方冒顶处理[J].国防交通工程与技术,2003,1(4):12-14. 被引量:6
  • 3郭喜平..高压旋喷注浆法在黄土地区公路软基处理中的应用研究[D].重庆交通大学,2004:

二级参考文献1

共引文献6

同被引文献15

引证文献4

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部