摘要
随着社会的进步和城市建筑的多元化,人们对高层建筑的要求也越来越高,高层建筑需要在设计、结构、材料、美观等多方面做出进一步调整以适应当前建筑行业的快速发展,其中最重要的就是高层建筑的结构问题,由于高层建筑本身上下部结构受力不均衡的特点,导致建筑的空间结构和具体的应用功能不协调,无法将受力过渡顺利完成转换。本文从高层建筑和钢筋混凝土梁式转换层的结构和受力转换进行具体分析,探究钢筋混凝土梁式转换层在高层建筑施工中的应用。
Along with the progress of the society and city building diversified,people on the requirements of high-rise buildings are more and more high, high-rise building,structure,material needs in the design,appearance and other aspects to make further adjustments to adapt to the rapid development of the construction industry,the most important of which is the high building structure problem,due to the characteristics of high-rise building itself the lower part of the structure of the unbalanced stress,leading to the construction of the spatial structure and the specific application functions are not coordinated,unable to force the transition smoothly complete the conversion.This article from the high-rise building structure and the reinforced concrete girder transfer floor and the stress transfer of specific analysis,to explore the application of reinforced concrete girder transfer floor construction in high rise building.
出处
《中国建材科技》
2015年第1期111-112,共2页
China Building Materials Science & Technology
关键词
高层建筑
钢筋混凝土
梁式转换层
施工技术
high-rise building
reinforced concrete
beam type transfer floor
construction technology