装配整体式混凝土剪力墙结构施工关键技术 被引量:18

KEY CONSTRUCTION TECHNIQUES OF ASSEMBLED MONOLITHIC CONCRETE SHEAR WALL STRUCTURE
下载PDF
导出
摘要 马驹桥公租房项目施工中,针对装配整体式混凝土剪力墙结构的工程特点,在预制构件吊装、现浇混凝土连接节点、转换层做法、钢筋连接套筒灌浆、预制墙板及叠合板支撑体系、塔式起重机与墙体锚固等工序,采用了一系列关键技术及措施,实施效果良好。 Considering the characteristics of assembled monolithic concrete shear wall structure inthe construction of Majuqiao Public Rental Housing project, a series of key techniques and measureswere adopted, such as lifting of prefabricated component, connecting node of cast-in-place concrete,construction of transition floor, steel bar connecting sleeve grouting, prefabricated wall panel andsandwich panel supporting system, anchorage of tower crane to wall, etc., and favorable effects wererealized.
出处 《建筑技术》 北大核心 2015年第3期212-215,共4页 Architecture Technology
关键词 装配整体式结构 预制构件吊装 钢筋连接套筒灌浆 支撑体系 assembled monolithic structure lifting of prefabricated component steel bar connectingsleeve grouting supporting system
  • 相关文献

参考文献2

  • 1DB11/T1030-2013,装配式混凝土结构工程施工与质量验收规程[S]. 被引量:5
  • 2JGJ1-2014,装配式混凝土结构技术规程[S]. 被引量:20

共引文献19

同被引文献68

引证文献18

二级引证文献102

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部