摘要
马驹桥公租房项目施工中,针对装配整体式混凝土剪力墙结构的工程特点,在预制构件吊装、现浇混凝土连接节点、转换层做法、钢筋连接套筒灌浆、预制墙板及叠合板支撑体系、塔式起重机与墙体锚固等工序,采用了一系列关键技术及措施,实施效果良好。
Considering the characteristics of assembled monolithic concrete shear wall structure inthe construction of Majuqiao Public Rental Housing project, a series of key techniques and measureswere adopted, such as lifting of prefabricated component, connecting node of cast-in-place concrete,construction of transition floor, steel bar connecting sleeve grouting, prefabricated wall panel andsandwich panel supporting system, anchorage of tower crane to wall, etc., and favorable effects wererealized.
出处
《建筑技术》
北大核心
2015年第3期212-215,共4页
Architecture Technology
关键词
装配整体式结构
预制构件吊装
钢筋连接套筒灌浆
支撑体系
assembled monolithic structure
lifting of prefabricated component
steel bar connectingsleeve grouting
supporting system