期刊文献+

放电线圈的故障原因与预防措施 被引量:10

Fault Cause and Prevention Measures of Discharge Coil
下载PDF
导出
摘要 以放电线圈已有的试验研究成果和现行产品技术标准为基础,从梳理放电线圈故障案例切入,按故障原因及发生时段分成"自身缺陷引发故障(投入后运行多时)"、"使用不当引发故障(投入后数分钟)"、"并发性故障(投切操作过程中)"等3类,可供实用参考;来自生产实践经验得出的3条预防事故措施建议为新编国标所采纳;提出的增设"连续运行"和"差压测试"2项检验项目有助于保证产品质量。 In this paper,the faults of discharge coil are classified into three types. Firstly,fault due to self defects(several hours after operation),secondly,fault due to incorrect use(several minutes after operation),thirdly,combination fault(during switching period)based on the existing research results and technical standards of current product and also on the fault case of discharge coil for practical reference. Three prevention measure suggestions of the faults from practice experience are adopted by the latest national standard. It is suggested to add such two test items as "Sustaining operation"and "Differential pressure test",which is helpful in quality assurance of product.
出处 《电力电容器与无功补偿》 2014年第5期52-59,69,共9页 Power Capacitor & Reactive Power Compensation
关键词 并联电容器装置 放电线圈 事故原因分析 预防事故措施 连续运行试验 差压测试 shunt capacitor installation discharge coil fault cause analysis fault prevention sustaining operationtest differential pressure test
  • 相关文献

参考文献11

二级参考文献15

  • 1杨立川,赵启承.放电线圈连接方式的探讨[J].浙江电力,2006,25(3):14-17. 被引量:5
  • 2GB50227-2008并联电容器装置设计规范[S]. 被引量:68
  • 3DL/T 584-2007.3-110 kV电网继电保护装置运行整定规程[S]. 被引量:5
  • 4河北省电力公司输变电设备反事故措施汇编[G].河北:河北省电力公司,2008. 被引量:1
  • 5东北电力试验研究院,放电线圈放电性能的试验研究[Z].1993. 被引量:1
  • 6国家电网公司.预防高压并联电容器事故措施[Z].2004. 被引量:3
  • 7DL/T 653-2009 高压并联电容器用放电线圈使用技术条件[S]. 被引量:4
  • 8GB/T 11024.1-2001标称电压1 kV以上交流电力系统用并联电容器[S]. 被引量:1
  • 9GB50227—95并联电容器装置设计规范[S].中国计划出版社,北京:1995. 被引量:1
  • 10GB/T11024.1—2001标称电压1kV以上交流电力系统用并联电容器[S].中国标准出版社,北京:2001 被引量:1

共引文献105

同被引文献67

引证文献10

二级引证文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部