盐穴储气库造腔过程夹层处理工艺——以西气东输金坛储气库为例 被引量:27

Interlayer treatment process in cavity building for salt cavern gas storage-A case study of Jintan Gas Storage of West-to-East Gas Pipeline
原文传递
导出
摘要 国内盐穴储气库造腔层段岩性复杂,不同深度存在不同厚度的夹层,夹层厚度从1 m至10 m以上,造腔结果相差较大。以金坛储气库8口造腔井为例,通过造腔参数分析,研究不同夹层处理工艺下的造腔效果,总结出多夹层盐岩段造腔工艺技术方案:使油水界面在夹层上部且距离夹层至少3-4 m;当油水界面在夹层下部时,控制油垫厚度小于0.1 m且腔顶直径不要太大;当前阶段油水界面位于夹层下部且腔体需要扩容时,将油水界面调整至夹层上部;当处理腔体下部夹层时,使内管位于夹层下部,至少在夹层位置。上述技术方案可为其他盐穴储气库建设提供参考和技术支持。 In China,the cavity building interval for salt cavern gas storage often features complicated lithology,and interlayers with varying thickness(from 1 m to 10 m or more) exist at different depths,leading to distinct results of cavity building result.Taking the 8 cavity building wells of Jintan Gas Storage as an example,through analyzing the cavity building parameters,and studying the cavity building effect under different interlayer treatment process,the cavity building solution for multi-interbedded salt rock is proposed:(1) the OWC is kept at least 3-4 m above the interlayer;(2) when the OWC is under the interlayer,the oil cushion thickness is controlled less than 0.1 m and cavern roof diameter should not be too big;(3) when the OWC is under the interlayer and the cavern needs to be expanded,the OWC is adjusted above the interlayer;and(4) when the interlayer beneath the cavern is treated,the inner pipe should be located under the interlayer or at least at the interlayer position.The solution can provide a reference and technical support for other salt cavern gas storage building.
出处 《油气储运》 CAS 北大核心 2015年第2期162-166,共5页 Oil & Gas Storage and Transportation
基金 中国石油天然气股份有限公司科技攻关项目"金坛盐穴地下储气库采卤造腔工程水处理及现场应用研究" K2011-31
关键词 盐穴储气库 夹层溶蚀 油垫厚度 油水界面 salt cavern gas storage interlayer dissolution oil cushion thickness OWC
  • 相关文献

参考文献6

  • 1EVAN D J, WILIAMS J D O, HOUGH E. The stratigraphy and lateral correlations of the Northwich and Preesall halites from the Cheshire Basin-East Irish Sea areas: implications for sedimentary environments, rates of deposition and the solution mining of gas storage caverns~C]. York: Solution Mining Research Institute Fall. 2011 Technical. Conference, 2011. 被引量:1
  • 2KENNETH E, MILL S. Specialized techniques in solution cavern shape control[C]. Chicago: Solution Mining Research Institute Spring Meeting, 198l. 被引量:1
  • 3MARIA K, BARTLOMIEJ R. Analysing cavern geometry development based on sonar measurements from the point of view of geological deposit structure[C]. Cracow: Solution Mining Research Institute Meeting, 1997. 被引量:1
  • 4KINGDON A, EVANS D J, HOUGH E, et al. Use of resistivity borehole imaging to assess the structure, sedimentology and insoluble content of the massively bedded Preesall Halite NW England[C]. York: Solution Mining Research Institute Fall 2011 Technical Conference, 2011. 被引量:1
  • 5李建君,王立东,刘春,周冬林,王元刚,何俊,薛雨.金坛盐穴储气库腔体畸变影响因素[J].油气储运,2014,33(3):269-273. 被引量:37
  • 6肖学兰.地下储气库建设技术研究现状及建议[J].天然气工业,2012,32(2):79-82. 被引量:56

二级参考文献24

  • 1EVANS D J. An appraisal of underground gas storage technologies and incidents for the development of risk as- sessment methodology[R]. Nottingham, UK.. British Geo- logical Survey, 2007. 被引量:1
  • 2DIAMOND H W. The water brine interface method, an alternative mechanical integrity test for salt solution min- ing wells[C]//SMRI Fall Meeting. San Antonio= SMRI, 1989. 被引量:1
  • 3BREST P, BERGUES J, BROUARD B, et al. A tentative evaluation of the MIT[C] // Houston SMRI Spring Meet- ing. Houston: SMRI, 1996. 被引量:1
  • 4MEUNIER G, LABAUNE F. Using inert gas almost twenty years of experience[C]//20th World Gas Confer- ence, 10-13 June 1997,Copenhagen Denmark. Copenhag- en:International Gas Union, 1997. 被引量:1
  • 5VIALA B, RASTATTER B. Process control upgrade boosts system flexibilit[J]. Oil & Gas Journal, 2009,107 (26) ..68-70. 被引量:1
  • 6陈卫忠,王者超,伍国军,杨建平,张保平.盐岩非线性蠕变损伤本构模型及其工程应用[J].岩石力学与工程学报,2007,26(3):467-472. 被引量:83
  • 7KAZARIAN V A, SMIRNOV V I, REMIZOV V V. The mass transfer processes intensification and improvement of cavern configuration formation at the construction of underground gas storages in rock salt[C]. Solution Mining Research Institute Spring Meeting, New Orleans, USA, April 19-22, 1998. 被引量:1
  • 8KRAINEV B A, KUBLANOV A V, BARYAKH A A. Geomechanical predictions and operational control of cavern convergence and subsidence due to the solution minning procedure[C]. Solution Mining Re,arch Institute Fall Meeting, Cleveland, USA, September 12-14, 1996. 被引量:1
  • 9ANDREJ Kunstman, KAZIMIERZ Urbanczyk, Application of winubro software to modelling of carven development in trona deposit[C]. Solution Mining Research Institute Technical Conference, Krakow, Poland, April 27-28, 2009. 被引量:1
  • 10KENNETH E, MILLS. Specialized techniques in solution cavern shape control[C]. Solution Mining Research Institute Spring Meeting, Chicago, USA, April 27,1981. 被引量:1

共引文献84

同被引文献175

引证文献27

二级引证文献154

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部