垂直升船机土建工程裂缝处理及结构加固——以隔河岩水电站第二级升船机为例

Cracking Treatment and Structure Reinforcement for the Civil Construction Part of the Second Stage Vertical Shiplift in Geheyan Hydropower Station
下载PDF
导出
摘要 介绍了隔河岩水电站第2级垂直升船土建工程裂缝处理措施,包括灌浆施工流程及方法。同时介绍了升船机建筑结构加固应用的材料,分析了加固的原因,提出了加固的措施。经实际检查,裂缝处理及结构加固均合格。 In the second stage vertical shiplift in Geheyan Hydropower Station,cracks are found in the civil construction part. The cracking treatment measures,including the grouting construction process,are introduced. Also,the civil structure reinforcement measures are adopted. The reason for the reinforcement,the construction materials used in the reinforcement are presented. Practice shows that the cracking treatment and structure reinforcement is satisfying.
作者 秦道先
出处 《水电与新能源》 2015年第2期46-49,共4页 Hydropower and New Energy
关键词 垂直升船机 裂缝处理 结构加固 隔河岩水电站 vertical shiplift; cracking treatment; structure reinforcement; Geheyan Hydropower Station
  • 相关文献

参考文献2

  • 1丁绍祥..混凝土结构加固工程技术手册[M].武汉:华中科技大学出版社,2008:321.
  • 2GB50367-2006,混凝土结构加固设计规范[S]. 被引量:597

共引文献596

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部