期刊文献+

义安煤矿顶板走向高抽巷的层位选定

layer selection of extraction of high gas drainage roadways lying the strike of roof In Yi'an coal mine
下载PDF
导出
摘要 为了解决义安矿工作面瓦斯涌出量大,上隅角瓦斯浓度经常超限问题,依据覆岩采动裂隙演化规律和"O"形圈理论,提出在工作面顶板布置高抽巷抽采采空区瓦斯,通过理论计算与数值模拟对采空区上覆岩层"两带"高度范围进行研究,确定裂隙带发育范围。而为了防止高抽巷被破坏,将高抽巷的设计层位选定为1.5倍采高。 In order to solve the gas emission quantity of Yi'an mine working face, the upper corner gas excess problem, on the basis of overlying fissure evolution law and "O" ring theory, proposed the layout of high level suction roadway in the working face roof to extract the gobs gas, through theoretical calculation and numerical simulation to study the ‘two zone' height of overlying strata in gobs, determined the fracture zone development scope. In order to prevent the destruction of the high level suction roadway, and selected the location of the high level suction roadway being 1.5 times for the mining height.
出处 《山东煤炭科技》 2015年第2期58-59,62,共3页 Shandong Coal Science and Technology
关键词 高抽巷 数值模拟 裂隙带 high level suction roadway numerical simulation fracture zone
  • 相关文献

参考文献6

二级参考文献19

共引文献937

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部