摘要
文章以四川大学华西医院某ICU改建工程为例,从基本建设管理的角度,探讨了综合医院ICU改建项目在前期论证、方案设计到施工图设计阶段应注意的相关事项。
The article takes Huaxi Hospital some ICU reconstruction project as an example, from the angle of capital construction design management, discusses the issues from early stage, schematic design to construction document design of the general hospital ICU reconstruction planning and design.
出处
《中国医院建筑与装备》
2015年第2期87-90,共4页
Chinese Hospital Architecture & Equipment
关键词
ICU
改建工程
规划设计管理
ICU Reconstruction project Planning and design management