期刊文献+

磷石膏、NH_3联合矿化天然气净化厂尾气中CO_2的流程模拟 被引量:3

Mineralization process simulation of CO_2 in tail gas of natural gas purification plant by phosphor gypsum combined with ammonia
下载PDF
导出
摘要 针对CCUS新工艺——磷石膏、NH3联合矿化天然气净化厂排放尾气中CO2,应用流程模拟方法,在物性估算、模型建立的基础上,对磷石膏矿化CO2反应的工艺条件进行了优化,提出反应温度为60℃、反应时间为100min的优化方案。对比优化后工艺条件与现有工艺条件的模拟结果可知,优化后尾气中CO2、NH3、磷石膏排放量比现有工艺排放量均减少3%以上。以降低工程能耗为优化目标,通过对全流程进行换热网络的设计,可使热公用工程能耗降低15%,冷公用工程能耗降低5.6%。 Using CCUS new technology of phosphor gypsum ,ammonia combined mineralizing CO2 in tail gas of natural gas purification plant ,and based on estimation of physical parameters and model establishment ,the process conditions for making use of the phosphorus gypsum mineralization of CO 2 were optimized with process simulation method .It proposed the optimized reaction temperature was 60 ℃ ,and the reaction time was 100 minutes .Compared the simulation results of optimized process conditions with the existing technology conditions ,it was concluded that the exhaust gas of CO2 , NH3 ,phosphor gypsum emissions were reduced by more than 3% compared with the existing process emissions .Aimed at the optimization goal of reducing the energy consumption , the heat exchange network design of whole process can reduce the energy consumption of hot utility by 15% and that of cold utility by 5 .6% ,respectively .
出处 《石油与天然气化工》 CAS 北大核心 2015年第1期12-16,共5页 Chemical engineering of oil & gas
基金 国家国际科技合作专项资助"工业尾气PM2.5减排与废水循环利用技术合作研究"(2014DFG92250)
关键词 磷石膏 NH3 天然气净化厂 CO2 流程模拟 换热网络 phosphor gypsum ammonia natural gas purification plant process simulation heat exchanger network
  • 相关文献

参考文献13

二级参考文献67

共引文献131

同被引文献38

引证文献3

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部