摘要
在风电场规划阶段,为研究地区电网允许接入风电场的最大容量,静态电压稳定性,在DIg SILENT软件中,绘制关键节点的PV曲线,分析了不同功率因数下电网的电压稳定性。以洋前风电场接入湛江电网为例,通过仿真得到了洋前风电场接入的最大容量。仿真结果可以为风电场规划提供一定的指导。
At the stage of wind farm planning, in order to determine the maximum installed capacity of wind power integrated into certain power grid and the static voltage stability, the P-V curve of some key nodes are drawn in DIg SILENT. The voltage stability is analyzed at different power factor conditions. Taking Yangqian wind farm that is connected into Zhanjiang power grid as an example, the simulation has gotten wind farm maximum capacity. The simulation results can provide certain guideline for wind farm planning.
出处
《可再生能源》
CAS
北大核心
2015年第2期209-213,共5页
Renewable Energy Resources
基金
国家自然科学基金项目(61273172)
关键词
风力发电机
潮流分析
风电场规划
PV曲线
静态稳定
wind power generator
power flow analysis
wind farm planning
P-V curve
steady-state stability