期刊文献+

女儿河万屯桥上下游段治理工程水面线计算

Water Surface Line Calculation for Wantun Bridge Upstream and Downstream Treatment Project of Nu'er River
下载PDF
导出
摘要 女儿河发源于兴城市药王庙乡五顶山五股泉,经由南票区暖池塘镇、乌金塘水库进入南票区境内,女儿河南票区段河长27.3km,现有堤防365km。女儿河南票区万屯桥上、下游段综合治理工程充分考虑目前河道的现状和治理后情况,并采用合理的数据。以此为基础对该河段洪水面线进行推算和结果分析,可为河道防洪堤的设计提供技术支撑。 Nu'er River originates from five strands of spring of Wuding Mountain in the Yaowangmiao Township, Xingcheng City, following through Nuanchi Town of Nanpiao district, Wujintang Reservoir and entering into Nanpiao District. The river section in Nanpiao District is 27.3km, existing dikes365km. Wantun Bridge Upstream and Downstream Treatment Project of Nu'er River fully considers the present situation and the river after treatment, and the use of reasonable data. The flood water surface line calculation and results based on the basis can provide technological support for the dike design of the river.
作者 王艳 李研
出处 《黑龙江水利科技》 2014年第11期65-66,共2页 Heilongjiang Hydraulic Science and Technology
关键词 河道 综合治理 工程 水面线 计算 river course comprehensive management engineering water surface line calculation Nu'er River
  • 相关文献

参考文献1

二级参考文献7

共引文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部