引水发电洞压力钢管洞内运输与安装方法 被引量:2

Discussion on Transportation and Installation Method for Diversion Tunnel Penstock
下载PDF
导出
摘要 某水利枢纽引水发电洞压力钢管及岔管管径大,而且需在现场制作安装,而施工区域小,交叉作业多,管节大,吨位重,吊装环节多。文章介绍了大管径压力钢管在洞内施工区域小、施工条件不足的情况下,采取洞内轨道运输、倒装的具体措施。 Large diameter pipes were used in a water conservancy diversion tunnel penstock and bifurcated pipe, and they need to be manufactured and installed on site, further more the construction area is small, with the cross operation, big pipe section, weight lifting, many links. This paper introduces the concrete measures of rail transportation and inversion method for the large diameter pressure pipe in the construction area, construction conditions under the insufficient condition.
作者 徐进忠
出处 《黑龙江水利科技》 2014年第11期52-54,共3页 Heilongjiang Hydraulic Science and Technology
关键词 引水发电洞 压力钢管 管径大 吨位大 安装 倒装法 diversion tunnel pressure pipe large diameter large tonnage installation inversioninstallation method
  • 相关文献

参考文献8

二级参考文献15

共引文献16

同被引文献14

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部