摘要
本工程滑坡治理是将填土区H1滑坡、老站场变形体、东西两侧冲沟纳入一体,从坡体变形的地形地势因素出发,综合考虑防滑稳定措施。
This landslide management project is to integrate the H1 landslide in landfill area, deformable body of the old station and the gully in east and west sides. Starting from the terrain and topography factors for the deformation of slope, this paper considered the stabilization measures for anti-landslide.
出处
《价值工程》
2014年第25期87-88,共2页
Value Engineering
关键词
避让
排水
削坡回填
重力式挡土墙
土层改良
生物工程
avoidance
drainage
slope cutting and backfilling
gravity retaining wall
soil improvement
biological engineering