摘要
考虑到枕头坝一级水电站施工场内交通与施工进度、施工布置、施工料场等方面之间的密切关系,结合交通规划布置的原则与标准,对场内施工材料的运输流向及强度进行了分析,重点阐述了施工场内交通规划布置方案。工程实践表明,该方案满足施工高峰期运输要求,道路桥梁布置合理,车辆通行安全高效,为工程的建设及顺利投产奠定了坚实基础。
In consideration of the close relation between jobsite transportation for construction and construction schedule,construction layout and material yard,the transportation trend and intensity of jobsite construction materials were analyzed in combination with the principle and standard of traffic planning-layout,and the jobsite traffic planning-layout scheme was determined.The construction practice indicates that the road and bridge were arranged reasonably,the traffic scheme can fully satisfy the transportation demands in rush-hour,the vehicular traffic is safe and effective.It provides a solid foundation for engineering construction and operation.
出处
《人民长江》
北大核心
2014年第24期50-53,共4页
Yangtze River
关键词
施工布置
场内交通规划
安全高效
枕头坝一级水电站
construction layout
jobsite transportation planning
safety and efficient
Zhentouba Ⅰ Hydropower Station