摘要
本文根据某铁路黄河大桥墩台基础度汛施工,结合钢板桩围堰,优化常规设计,达到节约投入、风险可控并安全度汛的目的,为以后同类型施工提供可靠的依据。
Based on the flood season construction of the abutment foundation of a Railway Yellow River bridge and combined with steel sheet pile cofferdam, the conventional design is optimized to achieve the goal of saving investment, risk control and safety in flood season. It can provide reliable basis for similar construction.
出处
《价值工程》
2015年第9期182-184,共3页
Value Engineering
关键词
钢板桩
漫水
度汛
steel sheet pile
flood water
flood control