基于经济指标的下向进路断面安全系数法分析 被引量:2

Safety Coefficient Analysis in Underhand Drift Section Based on Economic Index
下载PDF
导出
摘要 为实现下向进路安全高效经济开采,采用弹性力学理论建立了下向进路薄板力学模型,得到充填体失稳破坏抗拉强度判据,在此基础上建立了下向进路P(h/M)经济模型。以山东某金矿为例分析了安全系数为1.8时,不同进路宽度、高度与下向进路充填经济指标的关系,研究表明:经济指标与进路宽度呈直线增长关系,与进路高度呈幂函数降低关系,且M≤1.5 m时经济指标大幅下降,M>1.5 m时经济指标缓慢下降。进而研究了进路半宽为1.3m到1.7 m,高度为2.8 m到3.6 m的经济指标,建议将传统安全系数分析结果(l=1.5 m、M=3.6 m、h=1.49 m)改为经济指标分析结果(l=1.4 m、M=3.6 m、h=1.40 m),此时充填成本降低1.64元/m3。由此得出,该方法具有很好的理论及现实意义。 To achieve an efficient and safe operation in Underhand drift stoping,the mechanical model of thin plate with downward drift was built by using elasticity mechanics and a criterion for tensile strength failure of filling body was obtained. Then the economic model of downward drift stoping P( h/M) was built. In the case of a gold mine in Shandong,the relationship between height and width of different drifts and economical index of downward drift filling was analyzed when safety coefficient is 1. 8. Research shows that the relationship between economical index and drift width is in linear growth,while the relationship between economical index and drift height is a negative power function. When M≤1. 5 m,economical index drops significantly. While economical index falls slowly as M>1. 5 m. Therefore,the economical index is analyzed when a half width of drift ranges between 1. 3 m and 1. 7 m,and height ranges between 2. 8 m and 3. 6 m. It is recommended that the analysis results of safety factor,l=1. 5 m,M=3. 6 m,h=1. 49 m,should be substituted by analysis results of economical indexes l=1. 4 m,M=3. 6 m, h=1. 40 m,for the filling cost has decreased by 1. 64 yuan per cubic meter. Therefore,this research has great theoretic value and realism significance.
出处 《金属矿山》 CAS 北大核心 2015年第1期34-38,共5页 Metal Mine
关键词 薄板模型 下向进路 安全系数 经济指标 Thin plate model Downward drift Safety coefficient Economic index
  • 相关文献

参考文献14

  • 1杨红伟,赵彬,蒲成志,衣永亮.下向进路人工假顶失稳机理研究[J].现代矿业,2009(12):13-15. 被引量:15
  • 2Souza E D E, Degagne D, Archibald J F. Minefill applications, prac- tices and trends in Canadian mines[ C ]//Proceedings of the 7th In- ternational Symposium on Mining With Backfill [ S. 1. ] : The Society for Mining, Metallurgy and Exploration, 2001 : 311-319. 被引量:1
  • 3O'Toole D. The basics of mine back-fill[ J]. Engineering and Mining Journal ,2004,205 (12) :27-29. 被引量:1
  • 4何书,赵奎.下向进路侧帮可动块体的稳定性力学分析[J].金属矿山,2012,41(12):5-8. 被引量:9
  • 5刘冬,金长宇,夏自锋,东龙宾,赵潘潘.焦家金矿破碎矿体采场进路的跨度优化研究[J].金属矿山,2014,43(2):18-21. 被引量:5
  • 6赵彬..焦家金矿尾砂固结材料配比试验及工艺改造方案研究[D].中南大学,2009:
  • 7韩斌..金川二矿区充填体可靠度分析与1#矿体回采地压控制优化研究[D].中南大学,2004:
  • 8孙恒虎等著..高水固结充填采矿[M].北京:机械工业出版社,1998:344.
  • 9Chadwick J. Benefits of back-fill [ J ]. Mining Magazine,2004 (7) : 26 -28. 被引量:1
  • 10Swan G, Brummer R. Backfill design for deep under-hand drift-and-fill mining [ C ] ////Stone D. Proceedings of the 7th International Symposium on Mining with Backfill. Littleton: SME, 2001 : 359- 368. 被引量:1

二级参考文献28

共引文献73

同被引文献38

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部