1A Artiba, E H Aghezzaf. An Architecture of a Multi-Model System for Planning and Scheduling [ J ]. International journal of Computer Integrated Manufacturing, 1997 (10) : 380-393. 被引量:1
2Babu A J G, Suresh N. Project management with time, cost and quality considerations [ J ]. European Journal of Operational Research, 1996, 88 (2): 320-327. 被引量:1
3Do Ba Khang, Yin Non Myint. Time, cost and quality trade- off in project management: A case study [ J]. International Journal of Project Management, 1999, 17 (4): 249-256. 被引量:1
4E1-Rayes K, A Kandil. Time-cost-quality trade-off analysis for highway construction [ J ]. Journal of construction engineering and management, 2005, 131 (4): 477-486. 被引量:1
5Hamed R Tareghian, Seyyed Hassan Taheri. A solution procedure for the discretetime, cost and quality tradeoff problem using electromagnetic scatter search [ J]. Applied and Computation, 2007, 190 (2): 1 136-1 145. 被引量:1
6Reza Ghodsi, Mohammad Reza Skandari, Morteza Allahver- diloo, et al. A New Practical Model to Trade-off Time, Cost, and Quality of a Project [ J ]. Australian Journal of Basic and Applied Sciences, 2009, 3 (4) : 3 741-3 756. 被引量:1
7Luong Duc Long, Ario Ohsato. Fuzzy critical chain method for project scheduling under resource constraints and uncertainty [ J ]. International Journal of Project Management, 2008 (26): 688-698. 被引量:1