1Sasou K,Nagasake A,Yukimachi T.A Study on The Operating Team Activity of a Nuclear Power Plant Under Abnormal Operating Conditions[J].Safety Science,1993,16(2): 143-156. 被引量:1
2Y.H.J.Chang,A.Mosleh. Cognitive Modeling and Dynamic Probabilistic Simulation of Operating Crew Response to Complex System Accidents:Part 1:Overview of The IDAC Model[J].Reliability Engineering and System Safety,2007,92(8):997-1013. 被引量:1
5Pape, M . A. , Wiegmann, D. A. , Shappell. S. Air traffic control (ATC) related accidents and incidents : a human factors analysis[A]. Presented at the 11^th International Symposium on Aviation Psychology[C ]. Columbus, OH: The Ohio State University, 2001 被引量:1
6Sasou K, Reason J. Team errors: definition and taxonomy [ J]. Reliability Engineering and System Safety, 1999, 65:1 -9 被引量:1
7Dormann&Frese, M. Error training: Replication and the function of Exploratory behavior[J]. International Journal of Human-Computer Interaction, 1994, 6(4) : 365 - 372 被引量:1
8Smith-Jentsch, K A; Zeisig, R L. ; Acton, B & McPherson, J. A. , Team dimensional training: A strategy for guided team self-correction. Making Decisions under Stress: Implications for individual and team training[Z]. Washington DC: American Psychological Association, 1998, 271 - 297 被引量:1
9威肯斯 CD 霍兰希 JG.工程心理学与人的作业[M].上海:华东师范大学出版社,2003.. 被引量:6
10Alan.D.Swan, Accident Sequence Evaluation Program Human Reliability Analysis Procedure[R], NUREG/CR-4772, SAND86-1996: 8-2 被引量:1