摘要
本文根据某具体工程,对水泥土搅拌桩施工与质量控制进行了详细分析,包括施工前技术准备、原材料、施工设备工作、工艺性试验、粉喷桩施工工艺、质量控制措施。
Based on a specific project, this paper analyzes the construction and quality control of cement-soil mixing piles in detail, including technical preparation before construction, raw materials, construction equipment work, manufacturability test, pile construction technology and quality control measures.
出处
《价值工程》
2015年第7期44-45,共2页
Value Engineering
关键词
水泥土搅拌桩
工艺性试验
施工工艺
soil-cement mixing pile
manufacturability test
construction technology