期刊文献+

汾河一坝枢纽滚水坝防渗、防冲除险加固方案 被引量:1

Danger-obviating and Consolidating Scheme of Seepage Control and Erosion Control of the Overflow Dam's Foundation of Fenhe NO.1 Hydraulic Project
下载PDF
导出
摘要 汾河一坝枢纽滚水坝存在渗透稳定与上游铺盖首端防冲问题,设计中首先对滚水坝现状渗透稳定及首端冲刷进行了复核计算,根据计算结果,提出了在上游设置钢筋混凝土水平铺盖及垂直钢筋混凝土防渗、防冲墙方案,并经过分析计算,认为该除险加固方案是有效合理的。 For the Fenhe NO.1 Hydraulic Project, there are two problems in the overflow dam's founfation: seepage stability problem and erosion problem at the upstream foundation head.In the design process, at first ,the calculation to check the seepage stability of the dam's status quo and the erosion situation of the upstream foundation head was conducted.According to the calculation results,a scheme to solve these problems was put forward.It is to establish a horizontal reinforced concrete blanket and a vertical reinforced concrete diaphragm on the upstream dam toe.Through analysis and calculation, it is considered that this scheme is effective and reasonable.
作者 常晓亮
出处 《山西水利科技》 2014年第4期33-35,共3页 Shanxi Hydrotechnics
关键词 汾河一坝枢纽 滚水坝 渗透稳定 上游防冲 防渗防冲墙 the Fenhe NO. 1 Hydraulic Project overflow dam seepage stability upstream erosion control seepageand erosion control diaphragm
  • 相关文献

同被引文献9

引证文献1

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部