介绍了原料加热炉各部件的组装顺序,离心铸造管的焊接及设备制造完毕后在烘炉过程中的技术要求。
The assembly sequence of parts of the raw material heating furnace was introduced; requirements in the dry-off oven process of the heating furnace after centrifugal casting pipe welding and equipment manufacturing were discussed.
出处
《辽宁化工》
CAS
2014年第10期1349-1350,共2页
Liaoning Chemical Industry
关键词
制造工艺
离心铸造管
烘炉说明
manufacturing process
centrifugal casting pipe
dry-off oven process