摘要
太旧高速公路K417+455—K417+540段为半填半挖路段,右幅填方段路面出现多条纵向沉降裂缝,对路基稳定及行车安全有一定影响,对此段路基的处治情况进行了介绍说明,为同类工程提供参考。
A section of Taijiu Highway was a half filling and half digging section, which had a certain influence on the subgrade stability and traffic safety. This paper introduced the s and provided references for the similar engineering. e treatment in the section
出处
《山西交通科技》
2014年第5期4-6,共3页
Shanxi Science & Technology of Transportation
关键词
路基
半填半挖
裂缝
变形
处治
抗滑桩
subgrade
half filling and half digging
crack
deformation
treatment
anti-slide pile