摘要
阐述了高压断路器合闸簧的安装与拆卸工艺的设计思路和结构设计要求,避免了人力资源浪费的问题,为企业安全高效的生产提供了工艺保障。
This paper describes the high voltage circuit breaker closing spring mounting and dismounting technology design and structural design requirements. The waste of human resources is solved to provide certain technical support for enterprise security,efficient productio.
出处
《机械工程师》
2014年第10期252-253,共2页
Mechanical Engineer
关键词
传动螺杆
推力球轴承
静轴
吊钩
transmission screw
thrust ball bearing
static axle
hook