超高层建筑框筒结构的混凝土墙柱托换施工技术 被引量:3

Construction Technology for Underpinning of Concrete Wall and Column in Super High-Rise Building Frame-Tube Structure
下载PDF
导出
摘要 在对某47层框筒结构高层建筑检测时,发现其第1至第5层有部分混凝土柱强度不足,但由于客观条件限制,又不允许采取加固处理。经过分析研究,只能在不影响主体结构的情况下,用局部替换的方法进行补强施工。经工艺优化,在混凝土柱托换施工后,经其检测,结果能够满足国家规范要求。其所积累经验,可供类似工程参考。 The examination of a 47-storey frame-tube structure showed that the strength of partial concrete columns from the first to the fifth floor was not high enough. Due to the limitation of objective condition, reinforcement treatment was not allowed. Through analysis study, we found that only the partial replacement method could be used for reinforcement without affecting the main structure. After underpinning construction, concrete columns had been tested to meet the national standard. The accumulated experience can provide reference for similar projects.
作者 王文明
出处 《建筑施工》 2014年第10期1125-1126,1132,共3页 Building Construction
关键词 高层建筑 框筒结构 混凝土墙柱托换 补强 有限元分析 super high-rise building frame-tube structure concrete column underpinning reinforcementfinite element analysis
  • 相关文献

参考文献6

二级参考文献19

共引文献94

同被引文献14

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部