60m大跨度宽幅预制箱梁端隔墙施工方案研究

Study of Construction Scheme for Bulkhead End in 60m Large Span Wide Prefabricated Box Girder
原文传递
导出
摘要 在国内外大型箱梁的生产中,宽幅三腹板扭曲异形梁的预制尚属首次,为使整体液压内钢模板有更大的适应性,对标准断面和端断面差异较大的箱梁预制采用二次成型工艺,并采用六点并联自动移梁技术解决无隔墙的箱梁移动,确保预制质量和工期,提高功效。 During the production of large-sized box girder in China and abroad, it's the first time to introduce the prefabrication of twisted heterotypic box girder with wide three-web plate up to date. In order to make the integral hydraulic steel mould-board more adaptable, post-forming process is used to prefabricate the box girder that has remarkable difference in standard section and end section. Meanwhile, the technology of six-point parallel automatic shifting is used to shift the box girder without bulkhead in order to ensure the quality of prefabrication and completion within the construction time limit, as well as to improve the efficiency.
出处 《公路》 北大核心 2014年第10期67-69,共3页 Highway
关键词 三腹板 扭曲异形箱梁 六点并联 移梁 工艺 three-web Plate twisted heterotypic box girder six-point parallel box girder shi{ting technologies
  • 相关文献

参考文献7

二级参考文献16

共引文献70

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部