摘要 随着测绘科学技术的不断发展,全站仪测量精度的不断提高,它已逐步取代了经纬仪在矿山测量应用中的主导地位。本文介绍了利用全站仪进行竖井联系测量的方法,并结合实例,重点对此方法的测量结果的精度进行了分析。 With the continuous development of science and technology of surveying and mapping, the continuous improvement of measuring accuracy of total station, the total station shaft elevation survey method has gradually replaced the leading position of theodolite in mine survey application. This paper introduces the method of shaft elevation survey using total station, and combined with examples, focuses on the analysis of the accuracy of measurement results of this method.
出处 《价值工程》 2014年第32期80-81,共2页 Value Engineering
关键词 平面联系测量 连接三角形 精度分析 全站仪 plane contact measurement connection triangle accuracy analysis total station
  • 相关文献

参考文献5

  • 1张国良,朱家钰,顾和和.矿山测量学[M].徐州:中国矿业大学出版社,2008. 被引量:35
  • 2孔祥元, 梅是义..控制测量学[M],2002.
  • 3李青岳,陈永奇主编..工程测量学 修订版[M].北京:测绘出版社,1995:428.
  • 4郑文华主编..地下工程测量[M].北京:煤炭工业出版社,2007:270.
  • 5李军.竖井定向联系测量新方法的应用研究[J].测绘通报,2005(8):44-46. 被引量:16

二级参考文献1

  • 1周立吾 张国良 林家聪.矿山测量学[M].中国矿业大学出版社,1990.. 被引量:3

共引文献49

同被引文献7

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部