工序加工时间不确定条件下作业车间调度问题的区间数求解方法 被引量:18

Interval number solving method for job-shop scheduling problem with processing time variability
下载PDF
导出
摘要 针对一类难以获取工序加工时间变量的准确分布规律或隶属度函数的作业车间调度问题,采用区间数方法描述工序加工时间不确定变量,在分析工件完工时间区间与交货期时间窗的6种关系的基础上,分析归纳出提前/拖期惩罚取值区间的求解方法;论证了提前/拖期惩罚区间可以预估提前/拖期惩罚值的波动范围,为不确定调度问题转化为区间调度问题求解提供了理论支撑。以提前/拖期惩罚的取值区间为优化目标构建了区间调度模型。通过区间可能度方法对不同的提前/拖期指标区间值进行定量比较,解决了遗传算法求解区间调度模型时适应度值的比较问题。通过算例仿真验证了区间数定理和调度算法的有效性。 For the job-shop scheduling problem with processing time variability, the processing time variability was described by interval number method. Based on analyzing 6 kinds of relations between job complete time interval and job due window, the calculate method of Earliness/Tardiness (E/T) penalty interval corresponding with processing time interval was given. The wave range of E/T penalty could be estimated by E/T penalty interval, which provided theoretic support to the transformation from uncertain scheduling problem to interval scheduling problem. Based on selecting E/T penalty interval as optimization goal, a new interval model was developed. The possibility degree of interval number was used to evaluate uncertain E/T target between different schedules, which solved the problem of fitness value evaluation in the evolution of genetic algorithm. The numerical simulation was conducted to demon- strate the effectiveness of proposed interval number theorem and model.
出处 《计算机集成制造系统》 EI CSCD 北大核心 2014年第9期2231-2240,共10页 Computer Integrated Manufacturing Systems
基金 教育部留学回国人员科研启动基金资助项目(教外司留第46批) 西北工业大学研究生创业种子基金资助项目(Z2013047)~~
关键词 加工时间不确定 作业车间调度 提前/拖期 区间数 区间可能度 processing time variability j ob-shop scheduling earl iness/tardiness interval number possibility degreeof interval number
  • 相关文献

参考文献16

  • 1GOREN S,SABUNCUOGLU I.Optimization of schedule robustness and stability under random machine breakdowns and processing time variability[J].IIE Transactions,2009,42(3):203-220. 被引量:1
  • 2CHENG T C E.Optimal common due date with limited completion time deviation[J].Computer and Operations Research,1998,15 (2):91-96. 被引量:1
  • 3GU J,GU M,CAO C,et al.A novel competitive co-evolutionary quantum genetic algorithm for stochastic Job-Shop scheduling problem[J].Computers & Operations Research,2010,37(5):927-937. 被引量:1
  • 4AZADEH A,NEGAHBAN A,MOGHADDAM M.A hybrid computer simulation-artificial neural network algorithm for optimisation of dispatching rule selection in stochastic Job-Shop scheduling problems[J].International Journal of Production Research,2012,50 (2):551-566. 被引量:1
  • 5MARJAN V D A,KEVIN V B,HAN H.Finding robust solutions for the stochastic Job-Shop scheduling problem by including simulation in local search[M]//Experimental Algorithms.Berlin,Gerrnany:Springer-Verlag,2013:402-413. 被引量:1
  • 6HU Y,YIN M,LI X.A novel objective function for Job-Shop scheduling problem with fuzzy processing time and fuzzy due date using differential evolution algorithm[J].The International Journal of Advanced Manufacturing Technology,2011,56(9/10/11/12):1125-1138. 被引量:1
  • 7HE C,QIU D,GUO H.Solving fuzzy Job-Shop scheduling problem based on interval number theory[C]//Proceedings of the 2012 International Conference on Information Technology and Software Engineering.Berlin,Germany:Springer-Verlag,2013:393-401. 被引量:1
  • 8LEI Deming.Population-based neighborhood search for JobShop scheduling with interval processing time[J].Computers & Industrial Engineering,2011,61 (4):1200-1208. 被引量:1
  • 9LEI D M.Interval Job-Shop scheduling problems[J].The International Journal of Advanced Manufacturing Technology,2012,60(1/2/3/4):291-301. 被引量:1
  • 10乔威,王冰,孙洁.用遗传算法求解一类不确定性作业车间调度问题[J].计算机集成制造系统,2007,13(12):2452-2455. 被引量:10

二级参考文献27

  • 1张超勇,饶运清,刘向军,李培根.基于POX交叉的遗传算法求解Job-Shop调度问题[J].中国机械工程,2004,15(23):2149-2153. 被引量:109
  • 2陈Ting.决策分析[M].北京:科学出版社,1987.. 被引量:32
  • 3樊治平.复杂多属性决策理论与方法的研究:博士学位论文[M].东北大学,1996.. 被引量:1
  • 4樊治平,东北大学学报,1997年,18卷,5期,555页 被引量:1
  • 5樊治平,博士学位论文,1996年 被引量:1
  • 6陈珽,决策分析,1987年 被引量:1
  • 7玄光男 程润伟.遗传算法与工程设计[M].北京:科学出版社,2000.. 被引量:293
  • 8WU S D, STORER R H, CHANG P C. One-machine rescheduling heuristics with efficiency and stability as criteria [J]. Computers in Operations Research, 1993,20(1) : 1-14. 被引量:1
  • 9ISHII H,MASUDS T. Two scheduling problems with fuzzy duedate[J]. Fuzzy Sets and Systems,1992, 46(3): 339-347. 被引量:1
  • 10MASATOSHI S, TETSU Y M. An efficient genetic algorithm for Job-Shop scheduling problems with fuzzy processing time and fuzzy dnedate[J]. Computers &Indnstrial Engineering, 1999, 36(2):325-341. 被引量:1

共引文献205

同被引文献151

引证文献18

二级引证文献82

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部