摘要
本文依托新建贵阳至广州铁路田坝岭隧道工程,介绍了田坝岭隧道进口D3K426+477的突水情况、现场紧急处理措施和后续处理措施。
Relying on new TianBaLing tunnel engineering fr-om GuiYang to GuangZhou railway, this article introduces the situation of water gushing at TianBaLing tunnel import D3K-426+477, emergency treatment measures on-site and subsequ-ent processing measures.
出处
《城市建筑》
2014年第11期346-346,351,共2页
Urbanism and Architecture
关键词
突水
紧急处理措施
后续处理措施
water gushing
emergency treatment measures
s-ubsequent processing measures