河北峪耳崖金矿盲竖井主溜井形式与施工设计研究

On Blind Shaft Main Chute Form and Construction Design of Hebei Yuerya Gold Mine
下载PDF
导出
摘要 随着矿山井下探矿和采矿工作的逐渐展开,大量的废石和矿石逐渐增加,如何合理利用主溜井实现废石与矿石的分离,利用主溜井的分段控制出矿石和废石来实现探矿工程与采矿工程的合理布置显得越来越重要。本文针对如何利用溜井的布置形式来实现放矿分段控制,减少放矿漏斗损耗进行研究。 With the gradually development of prospecting and mining work under the wells, large quantity of waste stone and ore increased gradually, and it's important to separate waste stone and ore by main chute and realize the reasonable arrangement of prospecting engineering and mining engineering by separating waste stone and ore by subsection control of main chute. This paper studied how to realize mine releasing subsection control by the arrangement forms of main chute to reduce the loss of mine releasing funnel.
出处 《价值工程》 2014年第30期143-144,共2页 Value Engineering
关键词 主溜井 分段控制 减少漏斗损耗 main chute subsection control reduce the loss of funnel