摘要
施工图审查是一项技术要求高、时限紧、信息量大、政策性强、工作强度大的工作。本文着重于将整个生产过程均置于系统管理,使得审查人员的工作强度得到减轻,效率得以提高,以便管理者可以随时掌控公司的运行状况。
The construction drawing review is a work with high technical requirements, tight time limit, large information, and strong policy and large intensity. This article focuses on the entire production process placed in the system management to reduce the working intensity of making censors and the efficiency has improved, so that managers can control the running status of the company.
出处
《城市建筑》
2014年第12期264-265,共2页
Urbanism and Architecture
关键词
科学
审图
管理
science
plan approval
management