摘要
随着国家对西部大开发政策的落实,南疆地区经济发展明显加速,为加快图木舒克市经济建设的持续发展,满足市内工业园区运输需求,需引入能力较大的铁路运输方式。根据图木舒克工业园区与南疆铁路的相对关系,结合工业园区主要车流情况,考虑南疆铁路既有车站及预留车站分布格局,探讨该地区铁路专用线的接轨方案。
Upon the full implantation of the large-scale development strategy for the western region of China,the South Xinjiang has been witnessing conspicuous economic boom.In order to further spur as well as to allow the sustainability of the economic growth of the Tumushuke City,railway transport for bulk freight is in dire need to meet the logistic demand by the city’s industrial parks.Based upon geographical distributions of industrial parks of Tumushuke City vis-a-vis the layout of the South Xinjiang rail lines,integrated with the logistic characteristics of the industrial parks along with the locations of existing railway stations and reserved parking,the present study undertakes the research and discussion on the railway track design for industrial service lines along industrial parks at Tumushuke City.
出处
《铁道建筑技术》
2014年第8期68-71,89,共5页
Railway Construction Technology
关键词
铁路专用线
接轨方案
经济技术比较
railroad for industrial service railway track design techno-economic analysis