摘要
根据呼准线、不连沟铁路专用线和大路热电厂在建厂区周边限制因素对大路热电厂铁路专用线进行设计分析,提出3个研究方案。从工程实施与投资方面考虑,对各方案进行技术经济比较,最终推荐何家塔站北咽喉接轨方案。
Based on Hohhot-Junger railway,Buiangou special railway and factors of thermal power plant,the special rail-way for Dalu thermal power plant is designed and analyzed.Considering the implementation and investment of the project and the plan comparison of technical economy of all schemes,then scheme of lines connection at Beiyanhou of Hejiata sta-tion are selected.
出处
《铁道建筑技术》
2014年第8期7-9,共3页
Railway Construction Technology
关键词
专用线设计
方案比选
疏解线
special railway design scheme comparison and selection distribution line