期刊文献+

动态规划法求解涤纶纺丝组件更换周期调度问题 被引量:3

Dynamic Programming Approach to Scheduling of Spinpack Replacing Cycle in Polyester Fiber Spinning Plants
下载PDF
导出
摘要 以总费用最小为目标研究了纺丝组件最佳更换周期。建立了纺丝组件清洗更换周期调度问题的动态规划方法模型,并用Matlab7.0软件进行求解。实验结果表明,该算法优于传统方法,证明了该方法的有效性和实用价值。 The object for the least total cost was studied about the optimal replacing cycle that minimizes the total cost.A dynamic programming model for spinpacks cyclic replacing was built and the solution to the above model was implemented by using MATLAB7.0.The experimental results show that this algorithm outperforms previous methods and illustrates its effectiveness and feasibility.
出处 《辽宁工业大学学报(自然科学版)》 2014年第4期216-219,225,共5页 Journal of Liaoning University of Technology(Natural Science Edition)
关键词 纺丝组件 动态规划 更换周期 涤纶短纤维 spinpacks dynamic programming(DP) replacing cycle polyester fiber
  • 相关文献

参考文献13

二级参考文献39

共引文献38

同被引文献15

引证文献3

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部