摘要
结合小柳沟地形地质图、矿井中段CAD图以及矿体剖面图,以实例说明3Dmine矿业软件三维建模的方法和流程,建立了小柳沟钨矿区地形模型、井巷工程布置及矿体模型。三维模型的建立,形象地展现了各工程的空间展布关系,具有一定的科学性和准确性,对矿山的生产具有重要的指导意义。
The method and process for establishing 3D relief model and shaft engineering layout and orebody models are demonstrated by example using 3Dmine mining software in combination with Xiaoliugou topography and geological maps CAD diagram at each level and orebody profile map.The 3D modeling can intuitively display the special distribution of projects and has a certain scientificity and accuracy.It is of great importance to the mine production.
出处
《化工矿物与加工》
CAS
北大核心
2014年第8期33-35,48,共4页
Industrial Minerals & Processing