某游泳健身中心比赛池屋面主桁架跨度大,净空高,不便于工厂制作和运输,故需现场组装,但拼装受周边环境条件的限制。通过对工程的工期、成本及吊装设备等因素进行综合考虑,采用了场馆内组装、双机抬吊就位的施工技术,优质、高效、安全地完成了施工任务。
The roof main truss for a swimming and health center features large span, high clearance and unconveniet prefabrication in workshop, which needs to be assembled on site, yet whose assembling is restrained by the surrounding conditions. Through an overall consideration of construction period, cost and lifting equipment, the construction technique of assembling it on site, as well as double-crane lift is used to complete the tasks effectively and safely with high quality.