摘要
通过对焦化厂铁路专用线装卸工艺需满足专业化、自动化和满足铁路车辆周转时间要求等重要因素的分析研讨,对萍乡市湘东区工业园铁路专用线装卸工艺进行了合理的选择,指出该专用线装卸工艺采用翻车机和筒仓配合,达到了预期的要求。
The paper analyzes special railway line handling technology factors including specialization,automation and railway vehicle turnaround time,rational selects special railway line handling technology of Xiangdong industrial park in Pingxiang city,and suggests combining tipper and silo handling technology,so as to achieve expected demand.
出处
《山西建筑》
2014年第25期167-168,共2页
Shanxi Architecture
关键词
铁路专用线
装卸工艺
能力
special railway line
handling technology
capability