湛江奥里油电厂输水管线施工测量技术

下载PDF
导出
摘要 介绍了湛江奥里油电厂全长789.64m的输水管线顶管施工测量控制网的选形与布设,以及顶管施工中纠偏措施,对类似作业极具参考价值。
作者 吴晓红
出处 《黑龙江科技信息》 2014年第13期183-183,共1页 Heilongjiang Science and Technology Information
  • 相关文献

参考文献4

二级参考文献18

  • 1Teruhisa N. A method for driving curved pipe-jacked tunnels[J].Tunneling and Underground Space Technology, 1996, 11(2): 3 - 25. 被引量:1
  • 2Haslem R F. Pipe-jacking forces: from practice to theory[A]. In: Proc.ICE North Western Association Centenary Conference in Infrastructure Renovation and Waste Control[C]. Manchester:Manstock, 1986. 173. 被引量:1
  • 3O'Reilly M P, Rogers C D F. Pipe jacking forces[A]. In: Proceedings of an International Conference on Foundations and Tunnels[C].Edinburgh: Engineering Technics Press, 1987.201. 被引量:1
  • 4Norris P. The behaviour of jacked concrete pipes during site installation[Ph.D. Thesis][D].London: University of Oxford, 1992. 被引量:1
  • 5Milligan G W E, Norris P. Pipe-soil interaction during pipe jacking[J].Geotechnical Engineering, 1999, 137(1): 27 - 44. 被引量:1
  • 6候学渊 钱达仁 杨林德.软土工程施工新技术合肥[M].安徽科学技术出版社,1999.. 被引量:1
  • 7候学渊 钱达仁 杨林德.软土工程施工新技术[M].合肥:安徽科学技术出版社,1999.39-42. 被引量:10
  • 8马·谢尔盖.顶管工程.北京:中国建筑工业出版社,1983. 被引量:4
  • 9刘强.顶管施工法在涵洞施工中的应用[J].山西建筑,2008,34(17):337-338. 被引量:2
  • 10伊易.长距离顶管管道失稳分析[J].建筑施工,1998,20(2):18-19. 被引量:7

共引文献46

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部