A Reliable Method of Pile Load Test on Cast-in-Situ Pile Group of Existing Building for Retrofitting

A Reliable Method of Pile Load Test on Cast-in-Situ Pile Group of Existing Building for Retrofitting
下载PDF
导出
摘要 Following the foundation failure of a building, with an aim of economical solution to strengthen other existing buildings of the same project, a new arrangement was implemented experimentally to test the adequacy of load bearing capacity of a few selected cast-in-situ RCC (reinforced cement concrete) pile groups without demolishing the existing buildings. In this test, the column bottom of an existing building was removed by the help of scaffolding and after that a frame system consisting tension piles and hollow beam was constructed over the pile cap of the to be tested pile group. The load was tested by the help of hydraulic jack system and the constructed frame system. This paper contains the detailed plan, arrangement and method of the test with illustrations. The deflection and loading data analysis is also included which was performed to determine the outcome of the test. Through this test method the appropriate assessment of capacity of pile group of existing building could be done successfully and in result the structure could be saved by only super structure retrofitting.
出处 《Journal of Civil Engineering and Architecture》 2014年第7期881-887,共7页 土木工程与建筑(英文版)
关键词 CAST-IN-SITU PILE load test load bearing capacity retrofitting. 结构改造 荷载试验 灌注桩 桩基 建筑群 现有建筑物 测试方法 现浇
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部